

Eridan’s breakthrough Radio Unit brings exceptional signal clarity, efficient transmission, and reduced energy use in a compact, 2.5 kg design. It’s built for performance where it matters most.


Ultra-Clean Signal™
Higher Throughput
Lower Power
Everywhere
Eridan’s breakthrough Radio Unit brings exceptional signal clarity, efficient transmission, and reduced energy use in a compact, 2.5 kg design. It’s built for performance where it matters most.


Eridan 5G Radio Unit
2R2T 40MHz | 1024QAM

With EVM as low as 0.4%, Eridan supports higher-order modulation, enabling more data to be transmitted in the same spectrum with unparalleled signal clarity.
Eridan’s radios deliver more usable coverage at the cell edge, with higher throughput and fewer drop-offs. Field tests confirm over 100 Mbps at 1.7 km using only 0.3W of output power.
Our Radio Unit uses less than 40 watts total, up to 5x more efficient than traditional radios. This minimizes operating costs, reduces heat, and supports off-grid power solutions.
At just 2.5 kg, Eridan’s RU installs easily on light poles, rooftops, and mobile structures without custom mounts or large enclosures.
- Radio Features
-
ULTRA-CLEAN SIGNAL™
With EVM as low as 0.4%, Eridan supports higher-order modulation, enabling more data to be transmitted in the same spectrum with unparalleled signal clarity.
Higher ThroughputEridan’s radios deliver more usable coverage at the cell edge, with higher throughput and fewer drop-offs. Field tests confirm over 100 Mbps at 1.7 km using only 0.3W of output power.
Lower Power ConsumptionOur Radio Unit uses less than 40 watts total, up to 5x more efficient than traditional radios. This minimizes operating costs, reduces heat, and supports off-grid power solutions.
Light WeightAt just 2.5 kg, Eridan’s RU installs easily on light poles, rooftops, and mobile structures without custom mounts or large enclosures.
- Technical Specs
-


1024QAM Capable
Our proprietary Ultra-Clean Signal™ technology ensures cutting-edge spectral efficiency. Future-proof and ready for the fastest speeds in high-density networks.
GaN Power Stages
We’ve integrated switching Gallium Nitride to produce high-efficiency, high-power RF signals. Reduces energy use by up to 5x while maintaining signal clarity.
Direct Polar Design
The all-digital design provides hyper-precise control for signal generation. Enables disaggregated and scalable networks anywhere.
Passive Convection Cooling
Engineered for resilient operation in the most demanding environments. Eliminates active cooling requirements by removing linear amplifiers

Two-Octave Frequency Agility
An unparalleled continuous tuning architecture, 600MHz to 4.2GHz, built into the hardware. This flexibility simplifies the creation of new band variants, ensuring rapid time-to-market.
Universal O-RAN 7.2x
An FCC-certified, drop-in replacement built for the future. Ensures seamless, flexible interoperability with multi-vendor Open RAN systems.

